Quality & safety

Quality, health and safety

Quality and safety are managed on every MEPCO site — including an operating airport terminal and government facilities — through defined procedures, inspections and records.

01

Quality assurance

Quality is planned into the work before installation starts.

  • Materials and equipment submitted for consultant approval before procurement
  • Work to approved shop drawings and specifications
  • Method statements for key installation activities
  • Clear responsibilities between MEPCO, the consultant and the main contractor
02

Quality control

Each stage is inspected and recorded.

  • Inspection of materials on delivery to site
  • Stage inspections before ceilings and shafts are closed
  • Pressure tests and electrical tests recorded
  • Snag lists closed out before handover
03

Testing & commissioning

Systems are proven before they are handed over.

  • Pressure testing of refrigerant, water and fire fighting piping
  • Electrical insulation and continuity testing
  • Start-up, air balancing and airflow measurement
  • Fire alarm cause-and-effect and smoke control interface testing
  • Witnessed tests and signed commissioning reports
HSE

Health, safety & environment

Safety and security are non-negotiable on every MEPCO site.

01

Site safety

PPE enforced, daily toolbox talks and regular safety inspections on every site.

02

Risk management

Risk assessments and method statements prepared before every installation activity.

03

Environmental care

Responsible waste disposal, energy-efficient designs and compliance with Kuwait environmental regulations.

04

Zero-incident target

Our target is zero accidents. Team members are trained in first aid, fire safety and emergency procedures.

Standards

Technical compliance

Works are installed to international standards and Kuwaiti authority requirements.

ASHRAE62.1 / 90.1Indoor air quality and energy efficiency standards for HVAC works.
NFPA13 / 20 / 72 / 92Sprinklers, fire pumps, fire alarm and smoke control systems.
BS ENBritish StandardsPlumbing, sanitary and piping installations.
KFFKuwait Fire ForceFire prevention requirements and approvals.
MPWLocal codesKuwait Ministry of Public Works specifications.
MEWRegulationsMinistry of Electricity & Water requirements for mechanical and electrical works.

Project-specific approvals and test certificates are provided with each project's submittals and handover documents.

Documentation

Project documentation

Every client receives a complete record of the installed systems.

  • Material submittals
  • Shop drawings
  • Method statements
  • Inspection & test records
  • Testing & commissioning reports
  • As-built drawings
  • O&M manuals
  • Warranty certificates